categoria | Architecture |
procedure | Open Design Competition in Two Grades |
contracting authority | Port System Authority of the Strait |
place | Messina - Italy |
typology | Waterfront |
year | 2023 |
amount | € 152.298.330,00 |
Activity performed | Development of Project Proposal |
Status |
Urban, architectural and functional redevelopment of the state maritime area between Boccetta and Annunziata creeks in the city of Messina
Joint Venture: Offtec srl (Parent Company), Valle 3.0 srl , Elaborazionipunto org srl, Studio Castiello Project srl, Geol. Dr. Luigi Butticè